QUALITY CONTROL

Inspection focused on what matters.

Defined checks before dispatch, matched to your drawing and project requirements.

VERIFIED PROCESS

Clear quality checkpoints from material receipt to export packing.

Each order is checked against the drawing that was confirmed, not against a generic catalog size. The same path covers a tube, a sheet, and a machined part.

MOQ from 10 pieces

Available for selected component requirements.

Sample lead time 7–10 days

Typical timing after technical and commercial confirmation.

Inspection records

Available according to the agreed project requirements.

CHECKPOINTS

From receipt to packing.

Four points cover the order. The drawing decides which dimensions are on the check.

01

Incoming review

The drawing, material callout, and order quantity are compared before cutting or machining starts.

02

In-process check

Features that affect fit are checked while the part is cut, drilled, or machined.

03

Final inspection

The finished part is compared with the agreed drawing before it is released for packing.

04

Export packing

Parts are packed to limit impact and surface damage. A packing note can travel with the shipment when the project asks for one.

WHAT IS REVIEWED

The check follows the drawing.

These are the items a carbon fiber component order usually includes. A project can add or drop items when the drawing requires it.

Drawing dimensions

Outer diameter, length, thickness, holes, and other features follow the drawing. The tolerance stays the one on that drawing.

Surface and edges

Gloss or matte finish, cut edges, and visible damage are reviewed before the part is accepted for packing.

Count and packing

The packed quantity is checked against the order. Long tubes, flat sheets, and machined parts can be packed separately.

PROJECT QUESTIONS

Records and the next step.

Yes. Inspection records are available according to the agreed project requirements. Ask for the format when the drawing is sent, so it can be prepared with the shipment.

The check follows the confirmed drawing. Outer size, length, thickness, holes, and other called-out features are reviewed. A tolerance that is not on the drawing is not assumed.

A minimum of 10 pieces and a 7–10 day sample lead time apply to selected component requirements, after the technical and commercial points are confirmed. A complex machined part can take a different route.

Send the drawing with the order quantity.

Include the material callout and any inspection record you need. The check is set from that package. Browse the product catalog if the part is a standard tube, sheet, rod, or profile.

error: Content is protected !!